From Rio to here
BRENDAN HOWLIN, T.D., Minister for the Environment (1994-1997) reflects on the blueprints, policies, and commitments that emerged from the Rio Earth Summit and looks at how far we have progressed since
Welcome to the archive of Construct Ireland, the award-winning Irish green building magazine which spawned Passive House Plus.
The feature articles in these archives span from 2003 to 2011, including case studies on hundreds of Irish sustainable buildings and dozens of investigative pieces on everything from green design and building methods, to the economic arguments for low energy construction.
While these articles appeared in an Irish publication, the vast majority of the content is relevant to our new audience in the UK and further afield. That said, readers from some regions should take care when reading some of the design advice - lots of south facing glazing in New Zealand may not be the wisest choice, for instance.
Dip in, and enjoy!
BRENDAN HOWLIN, T.D., Minister for the Environment (1994-1997) reflects on the blueprints, policies, and commitments that emerged from the Rio Earth Summit and looks at how far we have progressed since
The winner of the sustainability award at the 2011 Irish Architecture awards, Roebuck Castle student residence at UCD’s Belfield campus is also the biggest certified passive house project built to date in Ireland and the UK. Tony Rigg of Kavanagh Tuite Architects explains how such a significant building achieved passive results.
If you’re applying for planning permission to build in Cappagh, North Ballymun or Northwest Balbriggan, 30% of your heating must come from renewable energy, and your heating must be less than 50Kwh/m2 per annum—roughly twice the standard of most new homes.


Eamon Ryan, former Minister for Communications, Energy and Natural Resources (2007-2011)

As energy prices continue to rise, the Irish construction industry is moving into uncharted territory, where all elements that affect energy performance—from orientation, to building design, to specification, to standard of workmanship—are increasingly recognised as key concerns.

The notion that curbing CO2 emissions would damage economic growth has been used as an excuse from developed countries such as the USA not to switch from fossil fuels to renewable energy. However, as Richard Douthwaite reveals, the people of Austrian town Güssing are discovering firsthand that this couldn’t be further from the truth.
Bank of America Tower, to be located at One Bryant Park in midtown Manhattan is a US$1 billion project that has been designed to be one of the most highly efficient and ecologically friendly tall buildings in the world. The building, currently under construction, is expected to be complete in 2008.
Jason Walsh got in touch with Cook + Fox Architects in New York, designers of the Bank of America Tower to see how the practice plans to square the circle of designing an environmentally sound high-rise building.

Newly inaugurated RIAI president Paul Keogh selects four diverse UK projects that integrate sustainability without compromising on design

When the two worlds of heritage and development collide opinions frequently become polarised and fraught with difficulty. There are few more vexed issues, as Tim Carey, Heritage Officer with Dun Laoghaire Rathdown County Council reveals